Navisworks Manage and Navisworks Simulate Difference

What is the difference between Autodesk Navisworks Manage and Navisworks Simulate? The table below shows the capabilities of each software for you decide which is the correct one for your usage.

Navisworks Manage

Control outcomes with clash detection and advanced coordination, 5D analysis, and simulation tools.

USE FOR:

  • Coordination and clash detection
  • Simulation and analysis
  • Quantification

WHAT IT DOES:

  • Clash detection and interference checking
  • Clash and interference management
  • Model file and data integration
  • NWD and DWF publishing
  • 5D project scheduling
  • Photorealistic model rendering
  • BIM coordination with AutoCAD
  • BIM 360 integration
  • Model aggregation
  • Integrated model takeoff
  • 2D sheet takeoff

INCLUDES:

  • BIM 360 integration

Navisworks Simulate

Review and communicate project details through 5D analysis and simulation.

USE FOR:

  • Simulation and analysis
  • Quantification
  • Model review

WHAT IT DOES:

  • Model file and data integration
  • NWD and DWF publishing
  • 5D project scheduling
  • Photorealistic model rendering
  • BIM coordination with AutoCAD
  • BIM 360 integration
  • Model aggregation
  • Integrated model takeoff
  • 2D sheet takeoff

INCLUDES:

  • BIM 360 integration

Contact us for more information: