Navisworks Manage and Navisworks Simulate Difference
What is the difference between Autodesk Navisworks Manage and Navisworks Simulate? The table below shows the capabilities of each software for you decide which is the correct one for your usage.
Navisworks Manage
Control outcomes with clash detection and advanced coordination, 5D analysis, and simulation tools.
USE FOR:
- Coordination and clash detection
- Simulation and analysis
- Quantification
WHAT IT DOES:
- Clash detection and interference checking
- Clash and interference management
- Model file and data integration
- NWD and DWF publishing
- 5D project scheduling
- Photorealistic model rendering
- BIM coordination with AutoCAD
- BIM 360 integration
- Model aggregation
- Integrated model takeoff
- 2D sheet takeoff
INCLUDES:
- BIM 360 integration
Navisworks Simulate
Review and communicate project details through 5D analysis and simulation.
USE FOR:
- Simulation and analysis
- Quantification
- Model review
WHAT IT DOES:
- Model file and data integration
- NWD and DWF publishing
- 5D project scheduling
- Photorealistic model rendering
- BIM coordination with AutoCAD
- BIM 360 integration
- Model aggregation
- Integrated model takeoff
- 2D sheet takeoff
INCLUDES:
- BIM 360 integration
Contact us for more information:


